PROJECT SPECIFICATIONS
WALLS
- All interior walls plastered and putty finished.
- Exterior walls painted with acrylic based paints.
FLOORS
- All common areas, lobbies and corridors made with Granite/ Marble/ Italian Marble.
- 800 x 800 mm vitrified tiles. Colour as per Developer/ Architect specification.
AIR CONDITIONING
- High-side air conditioning through chilled Water Chillers.
- Chilled water pipes terminated at a single point outside the Offices/ Retail Shops.
FIRE FIGHTING & SAFETY
- Complete High Side as per Fire Department norms.
- Water supply for Fire Alarms and Sprinklers.
100% POWER BACK UP
- 100% Power backup through Diesel Generators with emergency and automatic failure panel.
COMMON TOILETS
- Set of ladies and gents toilets matching global standards.
- Accessible Toilets for differently abled.
WINDOWS
- Powder-coated Aluminum/ High grade uPVC
OFFICE DOORS
- Safety Flush Doors
ELECTRIFICATION
- Concealed PVC conduit with insulated copper wires.
- Provision of Cable/ DTH/ Internet/ Telephone line.
- MCB distribution board.
- All brought to a Single Point outside the Offices/ Retail Shops.
RETAIL SHOPS DOORS
- Store Glass Doors
- Protection shutters
AMENITIES
EXCLUSIVE TOILETS & PANTRIES
- Provision of shafts and pipelines to connect common pipelines to facilitate setting up exclusive toilets and pantry within each office.
PARKING FACILITY
- Double Stacked Parking for more than 500 Cars and300two wheelers in 3 basements.
- Reserved multilevel parking on 3rd& 4th Floors for offices.
- Provision of valet parking.
CONCIERGE MANNED OFFICE LOBBY
- Office lobby to be manned with Concierge Service to facilitate filtering and security check of unwanted walk-ins into office areas.